Data Centers in North Dakota
North Dakota is home to 23 data center facilities totaling 1,917 MW of capacity. 7 projects are under construction or planned.Explore the full breakdown of water usage, noise, tax incentives, and upcoming construction below.
23
1,917 MW
11
16
3
4
5
12
4,006
All Facilities in North Dakota (23)
| Facility | Status | Capacity | Water-cooled | Noise | Tax incentives |
|---|---|---|---|---|---|
North Dakota Data Center 1 Unknown | Operating | 193 MW | Yes | moderate | No |
North Dakota Data Center 13 Unknown | Operating | 180 MW | Yes | moderate | Yes |
North Dakota Data Center 9 Unknown | Operating | 175 MW | No | high | Yes |
North Dakota Data Center 10 Unknown | Operating | 154 MW | No | high | Yes |
North Dakota Data Center 3 Unknown | Operating | 118 MW | Yes | low | Yes |
North Dakota Data Center 2 Unknown | Operating | 108 MW | Yes | moderate | Yes |
North Dakota Data Center 8 Unknown | Operating | 104 MW | No | moderate | No |
North Dakota Data Center 6 Unknown | Under Construction | 104 MW | Yes | low | Yes |
North Dakota Data Center 22 Unknown | Operating | 104 MW | No | low | Yes |
North Dakota Data Center 7 Unknown | Planned | 86 MW | No | high | No |
North Dakota Data Center 14 Unknown | Operating | 80 MW | No | high | No |
North Dakota Data Center 15 Unknown | Planned | 79 MW | Yes | moderate | No |
North Dakota Data Center 21 Unknown | Operating | 62 MW | No | moderate | No |
North Dakota Data Center 4 Unknown | Under Construction | 62 MW | No | moderate | No |
North Dakota Data Center 16 Unknown | Operating | 56 MW | Yes | moderate | No |
North Dakota Data Center 20 Unknown | Planned | 49 MW | Yes | moderate | No |
North Dakota Data Center 5 Unknown | Under Construction | 47 MW | No | moderate | Yes |
North Dakota Data Center 17 Unknown | Operating | 46 MW | No | moderate | Yes |
North Dakota Data Center 19 Unknown | Operating | 41 MW | Yes | moderate | Yes |
North Dakota Data Center 11 Unknown | Operating | 29 MW | No | low | Yes |
North Dakota Data Center 23 Unknown | Operating | 17 MW | Yes | high | No |
North Dakota Data Center 18 Unknown | Operating | 15 MW | No | low | Yes |
North Dakota Data Center 12 Unknown | Planned | 8 MW | Yes | low | No |
Power costs are in the news. Know what your bill looks like.
Estimate your next utility bill in under a minute with our free tool.
Estimate my billWater usage from data centers in North Dakota
11 of 23 data center facilities in North Dakota use water-based cooling, drawing an estimated 0 gallons per day combined. Water-cooled facilities rely on evaporative cooling towers, which can place strain on local water supplies — particularly during drought conditions. Residents near these sites may want to monitor local water utility reports and conservation measures.
Tax incentives for data centers in North Dakota
12 facilities in North Dakota receive local or state tax incentives. These incentives — often property tax abatements, sales tax exemptions on equipment, or utility rate discounts — are used to attract data center investment. Residents should understand how these agreements affect local tax revenue, school funding, and public services.
Noise impact from data centers in North Dakota
5 facilities in North Dakota are classified as high-noise sites, where cooling fans, HVAC systems, and backup generators may be audible from nearby homes. An additional 12 are rated moderate. Residents living within a few hundred feet of these facilities should be aware of potential low-frequency hum, especially at night when ambient noise is lower.
Power costs are in the news. Know what your bill looks like.
Estimate your next utility bill in under a minute with our free tool.
Estimate my bill